How to improve the installation of the primary components of the instrument on the perforated steel-plastic pipe?

2009-03-17View Original

Thread Content

In the desalted water workshop under construction, a large number of perforated steel-plastic pipes (PSSCP) are used in the design of process pipelines. Since this pipe is a new material, the design is not very mature. The pipe wall structure of the perforated steel-plastic pipes determines that it cannot easily install primary components of the instrument like steel pipes or stainless steel pipes. Instead, the primary components of the instrument must be installed by adding short stainless steel pipes. This requires the addition of many flanges, bolts, and gaskets, making construction and operation troublesome. I hope everyone can discuss the issue of "how to improve the installation of primary components of instruments on mesh steel-plastic pipes".
Reply #22009-03-17
Only flange connection can be used. It is the same as installing instruments on lined pipes.
Reply #32009-03-18
Only flange connection can be used. It is the same as installing instruments on lined pipes.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.