2. What are the daily maintenance and operation tips for GC? What is the main significance of proper routine maintenance in the use of GC?

2009-03-18View Original

Thread Content

As the title suggests, everyone is welcome to discuss this. This post was last edited by yzhms on 2009-3-24 at 23:32.]
Reply #22009-03-21
1. The analysis surface on which the GC is placed must be free from vibration and should be located away from the work area. 2. A dryer should be installed in the air supply system pipelines (both molecular sieves and color-changing silica gel can be used). 3. During operation, it is necessary to strictly follow the operating procedures; for example, the bridge current of the TCD must be activated only when there is a carrier gas, and the set temperature of the FID detector must not be lower than 100 degrees. 4. There should be dedicated record books for the daily use and maintenance of GC, with specific individuals assigned to handle them. 5. The purity of the gas used must meet the requirements for GC use. 6. Care must be taken to ensure that the hydrogen pipeline does not leak, as this can be dangerous. To ensure a long service life for the instrument, daily protection is very important.
Reply #32009-03-22
It is highly beneficial to extend the service life of GC
Reply #42009-03-23
The GC maintenance in our analysis laboratory is as follows: 1. Inspection of the various air valves, primarily by using soapy water to check for leaks; 2. Daily checking of the pressure in the gas cylinders – if the gas is exhausted, it must be replaced immediately and recorded. This step is no longer necessary with the use of a gas generator, as there are no longer any gas cylinders needed; 3. Regular cleaning of the chromatography column, usually by using ethanol to remove organic impurities from within, and heating can also help eliminate certain impurities and gases; 4. Cleaning of the instrument’s surface
Reply #52009-03-24
The GC in our analysis laboratory operates almost 24 hours a day, and the following maintenance tasks are generally carried out: 1. Regularly replace and clean the liner of the vaporization chamber; the sampling pad is replaced from time to time. 2. Analysts report on the condition of the instrument at the end of each shift, including gas usage levels. 3. The exterior of the instrument is cleaned once a week. 4. Compressed air is used to clean the interior of the instrument and remove dust on a quarterly basis. These measures ensure that the chromatograph can operate stably over the long term, maintains good separation and analysis performance, guarantees accurate analysis results, and also extends the instrument’s service life. This post was last edited by flks224086 on 2009-3-24 at 20:36

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.