HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems with liquid seal tubes

2009-03-18View Original

Thread Content

The book states that the liquid seal tube should be filled to its minimum height; and when its position is related to the equipment (or pipes), the required minimum distance should be maintained. I understand that the liquid seal tube has specific height requirements, but why is it necessary to maintain a certain distance between it and the equipment? This post was last edited by 040801083 on 2009-3-19 16:37.]
Reply #22009-03-18
http://cache.qihoo.com/wenda.php?do=snap&act=fetchHtmlsnap&m=104b449b948c04bcec9cf4cc0d3c5c73&surl=http%3A%2F%2Fbbs.hcbbs.com%2Fthread-349775-1-1.html&kw=%D2%BA%B7%E2
Reply #32009-03-18
Oh. I see; the liquid seal device maintains a certain pressure within the equipment system by using the liquid level in the liquid seal tank, as controlled through an insertion tube, thereby preventing the leakage of the medium. Therefore, a certain height for the liquid column is necessary. At the same time, if the liquid column is higher than the equipment, water will flow back into the equipment. Hence, the liquid level of the seal must be lower than that of the equipment. Moreover, if there are fluctuations in the equipment’s pressure and it occasionally reaches a negative pressure state, then even if the liquid level of the seal is at the same level as or slightly lower than that of the equipment, the liquid in the seal could still flow into the equipment. Thus, the liquid column of the seal needs to be at a lower height than the equipment in order to prevent the sealing liquid from flowing back into the system. Right? It seems that process design is like life: only by being thorough at every step can one move forward steadily.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.