Rules: 1. If you want to answer immediately, please give a score of +1 wealth to Floor 1 and write your answer in the “Reason for action” field (only the content within parentheses); see the diagram below for details. 2. One “*” represents 1 Chinese character (or 1 digit), and the answer must match exactly to be considered correct. 3. The first person to answer correctly will receive +10 wealth points; please reply in the comments on floor 2 or below to claim the reward ; 4. The scope of questions covers the commonly used standards and experience manuals in the fields of process engineering and piping ; 5. The difficulty level of the questions increases from easy to difficult. 6. Lower-grade students are welcome to participate actively. Question of this issue: 032. When the width of the facility is greater than 60m, what should be installed within it? (*******) Correct answer: A continuous fire escape. Winner: huaweizhou. This post was last edited by hutom123 on 2009-3-25 09:00
When the width of the facility exceeds 60m, a through fire lane should be provided within the facility
A through fire escape should be provided within the installation
032. When the device width is greater than 60m, a (throughfire road) should be provided within the device
032. When the device’s width is greater than 60m, a (throughgoing fire escape) should be provided within the device
Answer: Assume a through fire escape