What tasks need to be carried out for the acceptance of the check valves in the new installation?

2009-03-20View Original

Thread Content

As the title suggests, what aspects should we pay attention to? Let’s discuss!
Reply #22009-03-20
Acceptance of valves at the handover stage of new installations: It shall be carried out in accordance with the testing and acceptance requirements for valves as specified in SH3501-2002 \"Code for Construction and Acceptance of Pipelines for Toxic and Flammable Media in Petrochemical Industries\". Project intermediate handover: The project intermediate handover marks the completion of the installation of the project facilities, and it marks the transition from individual unit tests to combined system tests. The handover at the intermediate stage is merely a transfer of responsibility for the storage and use of the equipment, and it does not relieve the construction party of its responsibilities regarding the quality of the project and its completion inspection. After the intermediate handover of the project, the project management department remains responsible for it until the completion acceptance. 2 Conditions required for intermediate handover of the project: 2.1 The project shall be completed in accordance with the design specifications ; 2.2 Preliminary evaluation of project quality is satisfactory ; 2.3 After the pressure testing of the process and power pipelines is completed, the system has been cleaned, purged, and made airtight, with insulation work largely finished ; 2.4 Static equipment strength testing, non-destructive testing, and cleaning completed ; 2.5 The individual testing of mechanical equipment is successful (except for those that require specific materials or special media and have not been tested) ; 2.6 After the load testing of large-scale units using air, nitrogen, or other media is completed, the automatic control systems such as the unit’s protective interlocks and alarms have been successfully calibrated and tested ; 2.7 The electrical, instrumentation, computer, as well as gas and fire/explosion prevention systems of the device have been successfully tested and calibrated ; 2.8 Demolish the temporary facilities used in construction in the equipment area; ensure that all work is completed, all materials are removed, and the site is clean, with the vertical structure construction finished ; 2.9 The items related to the three inspections and four determinations that have an impact on the joint commissioning, as well as the handling of design changes, have been completed; the responsibilities for other unfinished tasks and their completion deadlines are now clear ; 3 Contents of intermediate handover in the project 3.1 Verification and handover of the actual quantity of works in accordance with the design specifications ; 3.2 Review, verification, and handover of preliminary evaluation materials for project quality and relevant commissioning records ; 3.3 Installation of specialized tools and handover of remaining spare parts and materials ; 3.4 Clearance of project residual items and confirmation of completion time ; 3.5 Handover of random technical documents. 4 For intermediate handover of the project, the project management department, production and construction teams, as well as the design units conduct intermediate inspections on a unit-by-unit and specialty-by-specialty basis. Finally, an intermediate handover meeting is held with the participation of the general contractor, production teams, project management units, construction teams, and design units, who then sign the intermediate handover agreement and its attachments.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.