HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

I need help calculating the height of the adsorption bed in a fixed-bed adsorber

2009-03-20View Original

Thread Content

Who has any books or formulas for calculating the height of the adsorption bed in a fixed-bed adsorber? It’s urgent!
Reply #22009-05-10
1. Penetration curve method 2. Hilov method t’=KZ, where t’ is the ideal penetration time, s; K is the adsorption layer protection constant, in s/m; Z is the height of the adsorption layer bed, in meters (the value to be determined)
Reply #32009-05-10
The modified Hilov equation: t = t’ – t0 = KZ – t0 = K(Z – Z0). Here, t represents the actual penetration curve; s*t0 represents the loss in adsorption time, and s*Z0 represents the loss in the height of the adsorption bed. The values of m, t0, and Z0 can all be determined through experiments. Under certain conditions, a series of penetration curves corresponding to different bed heights are measured; by plotting a straight line graph of t versus Z, the slope of this line gives K, while the intercept gives t0. From this, Z0 can be calculated

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.