Calculate the daily and nightly coal consumption of the coke oven

2009-03-20View Original

Thread Content

A 2×25-hole coke oven with a single charging capacity of 3.94 tons, and a turning time for the carbonization chamber of 12 hours – what is the daily coal consumption of this coke oven? Last edited by ryn on 2009-3-21 12:02.]
Reply #22009-03-20
66 series coke ovens? Is a week 12 hours long? 50/12×3.94×24≈394 tons
Reply #32009-03-21
The turnaround time mentioned by the original poster is indeed problematic; it should be 12 hours. The calculation method is as provided by the second poster. Let me explain it: one turnaround time corresponds to one small cycle, during which all 50 carbonization chambers – 2*25 chambers – produce coke once. With a turnaround time of 12 hours, two cycles occur in one day and night, that is, two small cycles. Each small cycle results in 50 batches of coke being produced, so two cycles yield a total of 100 batches. Each batch requires 3.94 tons of coal, so 100 batches require 394 tons of coal in total. Hence, the amount of coal used in one day and night is 394 tons, haha! It’s a bit wordy, but since the original poster is new to this topic, it’s better to explain things clearly. The key is to understand what turnover time means, and then the problem will be easily solved!
Reply #42009-03-21
2*25*24*3.94/12=394 tons
Reply #52009-03-21
Upstairs, the calculation is based on the turnaround time. As for my understanding, it is centered around the amount of coal that can be loaded into each carbonization chamber per hour. Each carbonization chamber receives 3.94 tons of coal per loading, and the coking time is 12 hours; therefore, 3.94/12 gives the average amount of coal that can be loaded into each chamber per hour. A furnace has 2*25 carbonization chambers, and there are 24 hours in a day, so the total amount of coal is 3.94/12*50*24 = 394 tons. I hope my explanation is clear.
Reply #62009-03-21
2×25×3.94×24/12=394 tons; 24/12=2 indicates two turnover cycles per day and night
Reply #72009-03-22
The turnaround time is 12 hours; this means that two batches can be produced per well per day. With 50 wells in total and 3.94 tons of coal per batch, the calculation is as follows: 2X50X3.94=394 tons.
Reply #82009-05-21
2×25×3.94×24/12=394 tons
Reply #92009-05-21
Everyone has said nice things, so I won’t add anything more. Now the original poster should understand!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.