HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is the pass rate per attempt?

2009-03-22View Original

Thread Content

In the construction plan for instrument wiring, the following information is provided: 6.2 Quality indicators: The pass rate for key inspection items is 100%, the pass rate for regular inspection items is 90%, and the rate of projects meeting high standards is 90%. What is the pass rate per attempt? How should this be understood? Is it simply the pass rate of the test points?
Reply #22009-03-22
Reference can be made to the \"Code for Acceptance of Construction Quality of Automated Instrumentation Projects\" GB50131-2007; generally, it refers to the pass rate of all the key control items and over 80% of the general items within a inspection batch
Reply #32009-03-22
A salute to those upstairs; thanks for the help! ! ! I’ve already seen it and basically understand it.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.