HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pumping foundation piling?

2009-03-22View Original

Thread Content

Has pile driving been done for the pump foundations at the bottom of the utility tunnels for everyone? Recently, the design institute required pile driving for the drawings, but I don’t think it’s necessary; just enlarging the foundation slab would suffice, wouldn’t it?
Reply #22009-03-22
Whether to drive piles depends on the data from the detailed geological survey report, as well as the size of the pump and the level of vibration
Reply #32009-03-22
1. Consider the size of your pump. 2. Consider the geological conditions. 3. Follow the relevant standards
Reply #42009-03-22
What size is your pump? How bad is the foundation? Piling? I haven’t come across small pumps yet. The 325KW hydrogen compressor also didn’t drive piles. The 375KW centrifugal pump didn’t drive piles either.
Reply #52009-03-22
Yes, for many devices, foundation piling is not even necessary. It really comes down to the same factors as before: whether the geological conditions are favorable and how heavy the equipment is

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.