HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the calculation of the total earthwork volume

2009-03-23View Original

Thread Content

In the volume calculation prior to project commencement, the grid method is used; what are the actual on-site elevation, design elevation, and construction elevation, and what is the difference between the construction elevation and the design elevation? Land leveling has requirements regarding density; are there any other requirements?
Reply #22009-04-16
The construction elevations all use relative elevations, while the design elevations can be either relative or absolute.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.