Thread Content
If you want to know more about the survey on the management ownership of various central control analytical laboratories of domestic chemical companies, please vote first, then reply here with the reasons for your choice, and go here to post. http://bbs.hcbbs.com/viewthread.php?tid=424029&extra=page%3D1&frombbs=1 Report the number of floors returned to claim the prize. This post was last edited by Cang Hai Yisha on 2009-3-24 09:41 ]
In-process control analysis is called over-control analysis in our case, which is process control, that is, control analysis of intermediate products, and is managed by the quality inspection center. This is because the people in the workshop are basically engineering majors, while the people in the quality inspection center are science majors. They have different educations in school, which means those with science majors are better at capacity analysis.
We are a caustic soda chemical company. Our central control belongs to workshop management, and most of the monitoring points are tested by the quality inspection center. Because it belongs to workshop management, we can get timely feedback on the test processing results, and the problem can be dealt with in a more timely and rapid manner.
Our inspection is jointly managed by two parts. The workshop operators do their own in-process analysis to determine whether a stop is needed. The time after the reaction reaches the end point has a greater impact on quality, so the results need to be analyzed immediately. The quality department conducts re-examinations to detect problems in a timely manner.
I think the quality inspection center should be better managed to prevent the pace of progress and neglect of inspections.
It should be attributed to the quality inspection center. The quality inspection center can propose changes to the process based on the data.
It used to be a workshop management, but now it is a quality inspection center. It always costs money to add samples, which is very troublesome.
The workshop management is better, but we only have one laboratory, so it is also a quality inspection center! :lol
Process control is completed by quality inspection to prevent cheating in the workshop.
The in-process control analysis is managed by the quality inspection center, but there are many opinions from the in-process control analysis and the workshop.
We are an independent laboratory and the quality inspection is one of the sections. Our workshop has 5 sections: chlor-alkali, epoxy, propane, trichlorethylene, polyvinyl chloride, raw materials and finished product circulating water.
Returning to the quality inspection center can reduce personnel, facilitate workshop assessment, and reduce analysis errors between upstream and downstream workshops.
In-process analysis is managed by the Quality Inspection Department, which makes the management of product quality more effective.