What documents should be submitted for the acceptance of pile foundation works?

2009-03-24View Original

Thread Content

What documents should be submitted for the acceptance of pile foundation works?
Reply #22009-03-24
Construction unit, project name, construction team, pile specifications and length, type of pile hammer and weight of the impact part, elevation of the natural ground surface, weight of the pile cap, designed elevation of the pile top, project supervisor, records, etc
Reply #32009-03-24
There are six points in total, as follows: 1. Pile position survey and setting-out plan. 2. Engineering geological survey report. 3. Material test records. 4. Records of pile fabrication and driving. 5. As-built plan of pile positions (plan showing the pile positions after the excavation of the foundation pit to the design elevation). 6. Static and dynamic load tests on piles, and records of pile penetration.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.