Common tube and tree heat treatment conditions

2009-03-24View Original

Thread Content

Pipe category, Nominal composition, Pipe grade, Heat treatment temperature (?°C), Heating rate, Holding time, Cooling rate: Carbon steel – C 10, 15, 20, 25; 600–650. When the heating temperature reaches 400°C, the heating rate should not exceed 205×25/T °C/h. The holding time should be 1 hour for every 25 mm of wall thickness, with a minimum of 15 minutes. During the holding period, the maximum and minimum temperature differences should be below 65°C. After holding, the cooling rate should not exceed 260×25/T °C/h, and it must not be greater than 260 °C/h; cooling can occur naturally at temperatures below 400°C. Medium and low alloy steels: C-Mn – 16Mn, 16MnR; 600–650. C-Mn-V – 09MnR; 600–700. 15MnR; 600–700. C-Mo – 16Mo; 600–650. C-Cr-Mo – 12CrMo; 600–650. 15CrMo; 700–750. 12Cr2Mo; 700–760. 5Cr1Mo; 700–760. 9Cr1Mo; 700–760. C-Cr-Mo-V – 12Cr1MoV; 700–760. C-Ni – 2.25Ni; 600–650. 3.5Ni; 600–630. Note: T – Pipe thickness.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.