Welding procedure qualification for 50,000-liter tanks

2009-03-25View Original

Thread Content

Welding procedure qualification for 50,000-liter tanks – I. Tank bottom: Four sets of weld qualification tests. 1. Butt weld of the edge plates: Welding method – manual welding for the root pass, submerged arc automatic welding for the fill pass, and cover welding. Base material: 16MnR + 16MnR; Welding method: Stick arc welding; Welding rod: E5015, Φ4.0mm; Welding process: Submerged arc automatic welding; Welding wire: H08MnA, Φ3.2mm; Flux: HJ431.
2. Butt welds of edge plates and middle plates: Base material: 16MnR (16mm) + Q235B (10mm); Welding methods: Carbon dioxide gas shielded welding + submerged arc automatic welding (with crushed welding wire); Carbon dioxide gas shielded welding: Welding wire: ER50-6, Φ1.2; Submerged arc automatic welding: Welding wire: H08A, Φ4.0mm; Flux: HJ431; Crushed welding wire: METAL GRIRS, Φ1.0×1.0mm.
3. Butt welds of middle plates: Base material: Q235B + Q235B; Welding methods: Carbon dioxide gas shielded welding + submerged arc automatic welding (with crushed welding wire); Carbon dioxide gas shielded welding: Welding wire: ER50-6, Φ1.2; Submerged arc automatic welding: Welding wire: H08A, Φ4.0mm; Flux: HJ431; Crushed welding wire: METAL GRIRS, Φ1.0×1.0mm.
4. Corner joints between the first layer of the tank wall and the tank bottom edge plates: Welding methods: Stick arc welding + submerged arc automatic welding; Base material: 16MnR + 16MnR; Stick arc welding: Welding rod: E5015, Φ4.0mm; Submerged arc automatic welding: Welding wire: H08MnA, Φ3.2mm; Flux: HJ431.

II. Tank wall – Seven groups of welding evaluations:
1. Longitudinal welds of the tank wall: Automatic gas shielded welding (gas-electric vertical welding); Welding wire: DWS‑43G, Φ1.6mm; Base material: 16MnR; Thickness: 22mm; Preheating before welding: ≥100°C.
2. Longitudinal welds of the tank wall: Automatic gas shielded welding (gas-electric vertical welding); Welding wire: DWS‑43G, Φ1.6mm; Base material: 16MnR; Thickness: 14mm.
3. Longitudinal welds of the tank wall: Automatic gas shielded welding (gas-electric vertical welding); Welding wire: DWS‑43G, Φ1.6mm; Base material: Q235B; Thickness: 10mm.
4. Transverse welds of the tank wall: Submerged arc automatic welding; Base material: 16MnR; Thickness: 22mm; Preheating before welding: ≥100°C; Welding wire: H08MnA, Φ3.2mm; Flux: SJ101.
5. Transverse welds of the tank wall: Submerged arc automatic welding; Base material: 16MnR; Thickness: 14mm; Welding wire: H08MnA, Φ3.2mm; Flux: SJ101.
6. Transverse welds of the tank wall: Submerged arc automatic welding; Base material: 16MnR + Q235B; Thickness: 10mm; Welding wire: H08MnA, Φ3.2mm; Flux: SJ101.
7. Transverse welds of the tank wall: Submerged arc automatic welding; Base material: Q235B + Q235B; Thickness: 10mm; Welding wire: H08MnA, Φ3.2mm; Flux: SJ101
Reply #22009-03-25
I have prepared budgets for tanks with a capacity of 5,000 m3; the welding process evaluation in such cases is relatively simple. I’ve never seen a tank with a capacity of 50,000 cubic meters before

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.