Does anyone know who conducted the environmental impact assessment for the coal-to-natural gas project in Datang Keqi?

2009-03-25View Original

Thread Content

Does anyone know who conducted the environmental impact assessment for the coal-to-natural gas project in Datang Keqi? **What is the specific approval from the Ministry of Environmental Protection? Thank you all!
Reply #22009-03-26
First Public Announcement on the Environmental Impact Assessment for the Gas Pipeline Project of the Inner Mongolia Datang Keqi Coal-to-Natural Gas Project I. Project Overview 1. Project Name: Gas Pipeline Project of the Inner Mongolia Datang Keqi Coal-to-Natural Gas Project 2. Nature of Construction: New construction 3. Location of Construction: The pipeline of this project starts at Haolaihure (Beijingzi) Station in Kesikteng Banner, Chifeng City, Inner Mongolia, and ends in Miyun County, Beijing. It passes through Weichang County, Longhua County, Fengning County, and Luanping County in Hebei Province. 4. Construction content: The total length of the pipelines for this project is 448 km; the diameter of all pipelines is DN800 mm, the design pressure is 10.0 Mpa, and the designed flow rate is 60×104 m3/h ; The external anti-corrosion coating of the pipeline adopts a combined protection scheme of a three-layer PE anti-corrosion coating along with cathodic protection ; There are 3 stations along the line (Haolaihure First Station, Guojiatun Pigging Station, and Xinan Zhuang Final Station), as well as 35 isolation valve rooms (of which 8 are RTU valve rooms). II. Overview of the Project Owner
Company Name: Datang International Power Generation Co., Ltd.
Mailing Address: Jingpeng Town, Keshiketeng Banner, Chifeng City, Inner Mongolia Autonomous Region
Phone Number: 0476-2351401
Postal Code: 025350
Contact Person: Ge Wensheng
E-mail: xhygws@163.com

III. Overview of the Evaluation Agency
Company Name: Beijing Feiyan Petrochemical Environmental Protection Technology Development Co., Ltd.
Mailing Address: No. 1, Yingfeng Sanli, Yanshan, Fangshan District, Beijing
Phone Number: 010-69336264
Postal Code: 102500
Contact Person: Cui Jun
E-mail: cuijun1211131@163.com

IV. Work Procedures
For this evaluation, environmental impact factors will first be identified and screened based on the process details and characteristics of the construction work. Subsequently, thorough investigations and data collection will be carried out to monitor and assess key environmental elements in a targeted manner. Major environmentally sensitive sites will also be investigated. By referring to results from similar investigations and monitoring, appropriate models and parameters will be selected to analyze quantitatively or qualitatively the environmental impacts during the project construction phase and after it goes into operation, as well as in the event of accidents. Recommendations for improvements in environmental protection and safety measures will also be put forward. V. Main tasks include engineering analysis, investigation and assessment of the current status of environmental quality (ecological environment, ambient air, water environment, and sound environment), analysis and assessment of environmental impacts during the construction phase (ecological environment, ambient air, water, noise, etc.), analysis and assessment of environmental impacts during the operation phase (ecological environment, ambient air, water, noise, etc.), environmental risk assessment, public participation, clean production and total amount control, environmental protection measures and technical-economic evaluation, economic benefit and cost analysis of environmental impacts, environmental management and environmental monitoring plans, as well as evaluation conclusions and recommendations. VI. Main matters for seeking public opinions 1. Degree of understanding regarding this project ; 2. Main impacts on the public during the construction and operation phases of this project ; 3. The public’s attitude toward the construction of this project from an environmental protection perspective ; 4. Public opinions and suggestions on the environmental protection measures taken for this project ; 5. Other opinions and suggestions from the public regarding the construction of this project. VII. Public Feedback On the period from October 22, 2007, to November 2, 2007, the public could express their opinions on the construction of this project and the environmental impact assessment process by submitting comments on the website, or by sending letters, faxes, or emails to the addresses listed above. The environmental impact assessment agency will accurately record the opinions and suggestions of the public in the project’s Environmental Impact Report, and convey these valuable inputs from the public to the project’s developers, designers, and relevant authorities.
Reply #32009-03-26
Environmental assessment agency: Beijing Feiyan Petrochemical Environmental Protection Technology Development Co., Ltd. February 5, 2009 – The project was approved following the completion of the environmental assessment
Reply #42009-03-26
What was said upstairs refers to the pipelines. The environmental impact assessment agency for the production facility is Wuhuan Technology.
Reply #52009-03-26
I am deeply grateful to all the experts; I have learned a great deal from them. I’ve learned a lot on this forum.
Reply #62009-03-30
I didn’t look closely last time; the second floor refers to pipelines, while the third floor refers to production equipment. So, who is responsible for conducting the environmental impact assessment for the coal-to-gas project itself?
Reply #72009-04-02
Is it unknown who will carry out the environmental impact assessment for the entire project?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.