The significance of steam purging before starting up a new unit

2009-03-27View Original

Thread Content

Before starting up the new unit, the main steam pipeline needs to be purged with steam. The purpose of this is to thoroughly remove any weld slag, impurities, or residual materials remaining in the main steam pipeline. 2 sets of main steam pipelines were subjected to thermal stress tests to examine their thermal deformation. Principle for purging steam pipelines: raise temperature first, then pressure. Temperature rise refers to the process in which, after the boiler starts generating pressure, the process workshop verifies that all drain valves on the main steam pipeline are open, as well as the end valves, with the aim of preventing pressure buildup and of warming up the main steam pipeline first. The outlet valve of the boiler outlet drum controls the flow rate of steam into the main steam line; this flow rate must not be too high to prevent water hammer from occurring in the main pipes. At this time, pay attention to the pressure changes in the boiler; it is necessary to prevent the boiler from being overstrained, which could cause the water inside the boiler’s drum to enter the pipelines. After steam is introduced, the process operators should inspect the steam bus to confirm the presence of backflow water, and inform the process operators at the next station to get ready. After some time, steam will appear at the end of the main pipe; then, the pipe needs to be warmed up for a certain period of time to raise the temperature of the steam main pipe, with the exact duration to be determined as appropriate. In short, the steam valve should be opened slowly to prevent water hammer and ensure the safety of the pipelines. Post-pressurization refers to the purging of the steam user pipelines after warming up the bus lines. The valve at the inlet of the steam user pipeline is closed to build up pressure, after which the valve is quickly opened for purging. It is important to note at this point that one should not try to clean everything at once; instead, it is necessary to clean each area sequentially. Blow purge 4-5 times. After the purging is complete, instruct the boiler to shut down and maintain pressure; allow the steam main to cool down, then raise the temperature, and repeat the previous steps. The purpose of heating and cooling is to remove rust from within the pipeline through thermal expansion and contraction. It should be noted that: if it is a new unit, remove the inlet valve before the steam user to prevent thermal expansion of the steam pipeline from damaging the equipment. The steam pipeline needs expansion joints to relieve thermal stress; the expansion joints used in our facility are quite small and failed to perform their function, resulting in the entire steam pipeline shifting by 80 mm. Fortunately, the steam users are all separated from the bus. Otherwise, the consequences are unimaginable. I’ve written down some thoughts in haste; I hope those who are more experienced can offer some guidance.
Reply #22009-03-27
Well said, and in great detail. One additional point: the steam inlet line of the turbine should undergo a targeting test – a special target plate is placed at the outlet, and based on the size and shape of the impurities on that plate, it can be determined whether the pipeline has been properly purged.
Reply #32009-03-27
What was said on the 3rd floor is correct; since we don’t have turbines, steam doesn’t need to enter the turbines, so the requirements for the steam main aren’t that strict
Reply #42009-03-27
Before starting up the new unit, it is not only the main steam pipelines that need to be purged; other pipelines such as those for air, nitrogen, and oxygen also need to be purged. The purpose is to remove debris such as weld slag from within the pipelines, as well as to detect any leakage points.
Reply #52009-03-27
It is very important for the purging process; otherwise, it can cause serious damage to the turbine! ! ! And the principle for purging is to purge the main pipeline first, and then the branch pipelines! ! This post was last edited by sgwwood on 2009-3-27 19:25]
Reply #62009-03-27
Purging is very important! I think it’s mainly to remove impurities!
Reply #72009-03-27
Steam purging is very important; not only should main and secondary pipelines be distinguished, but purging should also be carried out multiple times with varying pressures and temperatures
Reply #82009-03-29
To add to the purpose of steam purging: 1) To further remove rust, slag, and other debris from equipment and pipelines, thereby preventing valves from getting stuck and pipelines as well as pumps from becoming clogged. 2) Check whether the installation of equipment and pipelines meets the design requirements, and inspect pipelines, flanges, welds, and valves for any leaks to ensure smooth pipeline operation and proper condition of the equipment. 3) Check the changes in process pipelines and equipment under thermal conditions to test them. 4) Be familiar with the process, conduct thorough technical training, and ensure smooth commencement of work.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.