Rules: 1. If you want to answer immediately, give a score of +1 wealth to Floor 1 and write your answer in the “Reason for action” field (only the content within parentheses); see the image below for details. 2. One “*” represents 1 Chinese character (or 1 digit), and the answer must match exactly to be considered correct. 3. The first person to answer correctly will receive +10 wealth points; please reply in the replies on floor 2 and below to claim the reward ; 4. The scope of questions covers the commonly used standards and experience manuals for the process and piping fields ; 5. The difficulty level of the questions increases from easy to difficult. 6. Lower-grade students are welcome to participate actively. Question for this issue: 061. Around equipment that may experience (******) or (**) during startup, shutdown, or maintenance operations, barriers and liquid diversion facilities at a height of no less than 150 mm should be installed. Standard answer: Leakage of flammable liquids; spillage. Winner: joy2016. This post was last edited by hutom123 on 2009-3-29 at 18:50.]
Reply #22009-03-27
During startup, shutdown, and maintenance operations, in areas that may be contaminated by oil-based corrosive substances or toxic materials, as well as around equipment used to handle such corrosive substances, barriers at a height of no less than 150 mm and liquid diversion facilities should be installed.
Reply #32009-03-27
Agree with the answer above: (areas contaminated by corrosive oil products or toxic substances), (handling of corrosive substances). This post was last edited by LLH0111 on 2009-3-27 at 17:15
Reply #42009-03-27
061. Around equipment where (emission of corrosive substances) and (pollution) may occur during startup, shutdown, or maintenance operations, dikes and liquid diversion facilities at a height of not less than 150 mm should be installed.
Reply #52009-03-27
Areas contaminated by oil-based corrosive substances or toxic materials – Treat the corrosive substances
Reply #62009-03-27
Areas contaminated by oil-based corrosive substances or toxic materials, as well as areas where such corrosive substances are being treated

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.