HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Design issues of absorption towers

2009-03-30View Original

Thread Content

Waste gas flow rate: 1500 m3/h; composition of the waste gas: acetic acid, **furan, methanol; concentration of the waste gas: 60 g/m3. Absorption towers are needed for recovery. Should I use a packed tower or a random packing design? When designing bulk packing, it is possible to use Ekt’s correlation diagram for calculations and look up values in tables; however, the flow rate of the liquid is required in these calculations. How can the flow rate of the liquid in the absorption tower be determined? Is there a design basis? Please give me some advice!
Reply #22009-03-30
Send your data to our email address; we are highly professional in carrying out calculations, designs, selections, and cost estimations for you.
Reply #32009-03-30
I’ve just started working; please don’t laugh at me if I make mistakes. Different packed towers have different requirements regarding spray density. The tower diameter is determined by the volume and flow rate of gas; the spray volume is determined by the tower diameter and spray density; the feed rate is determined by material balance, which in turn determines the circulation volume. This is a rough estimate; I won’t do an exact calculation.
Reply #42009-03-31
Could you give a specific calculation method? Are people currently using software or a large number of mathematical formulas for calculations?
Reply #52009-03-31
I can’t do the calculations, but I know that software is needed – ASPEN, PRO2. They are used for process calculations.
Reply #62009-04-05
Is there a place where software is available? You can find the relevant software there; please let me know
Reply #72009-04-06
1. Selection between bulk and structured types: For small towers, as well as systems that are prone to clogging and have high corrosivity, bulk packing is a more suitable choice. 2 Determination of liquid flow rate: The absorption requirements of the process and the wetting limit of the packing determine the liquid flow rate. 3 When designing bulk packing, calculations can be carried out using Ekt’s correlation diagram

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.