The 160,000 t/a coal indirect liquefaction synthetic oil demonstration plant of Lu’an Group has successfully produced oil

2009-03-31View Original

Thread Content

This post was last edited by jordan569 on 2013-1-6 at 22:37. On December 22, 2008, the 160,000 t/a coal-based synthetic oil demonstration project of Lu’an Group successfully produced oil; this was China’s first demonstration facility for coal indirect liquefaction to produce synthetic oil. The Lu’an coal-to-oil demonstration project was selected through a **-level project bidding process. It is located within the Tunliu coal-oil circular economy park of the Lu’an Group; construction began in February 2006, and the gasifier was successfully ignited on September 15, 2008. This project relies on the \"industrialized slurry-bed technology for coal-based liquid fuel synthesis,\" which possesses independent intellectual property rights in our country, as its core technology. It incorporates advanced Fischer-Tropsch synthesis methods such as iron-based slurry beds and cobalt-based fixed beds, with main products including diesel, paraffin, naphtha, LPG, and a small amount of mixed fuel alcohols. This project is a pivotal demonstration project for Shanxi Province and China’s coal industry. The successful production of oil from it signifies significant progress in the Lu’an coal-based synthetic oil project. It holds great importance for Lu’an Group in terms of adjusting its industrial structure and advancing the development of circular economy parks, as well as for China’s research and development in alternative energy sources and the industrialization of indirect coal liquefaction. The project development plan is as follows: once the project is successful, the construction of the first industrial plant with a capacity of 3 million tons per year will be completed between 2009 and 2012, with each production unit having a capacity of 400,000 tons per year to 600,000 tons per year ; From 2012 to 2015, the construction of a second industrial plant with an annual production capacity of 3 million tons was completed, ultimately turning Lu’an Group into a competitive and influential demonstration base and production site for coal-based synthetic oils in China. . Note $ # , $ $
Reply #22009-03-31
The oil output comes from an industrial side line of a 160,000-ton synthetic oil plant; it uses a fixed-bed cobalt-based catalyst and operates on a scale of several hundred tons per day – it is therefore a pilot-scale facility. This plant makes use of technologies such as pressurized coal gasification and gas purification to produce high-quality coal-based syngas. Its designed production capacity is 150 barrels per day. It began operating on December 16, 2008, and has been in continuous operation to this day. On December 22, 2008, the 160,000 tons per year coal-based synthetic oil demonstration project of Lu’an Group made new progress. The cobalt-based catalyst fixed-bed unit with an annual capacity of 10,000 tons included in the project produces oil products, marking the completion of all facilities ranging from boilers and air separation units to gasification and gas purification units. This lays a solid foundation for the subsequent commissioning of the iron-based slurry-bed synthetic oil unit with an annual capacity of 160,000 tons. For more details, please refer to http://bbs.hcbbs.com/thread-424018-1-1.html and http://bbs.hcbbs.com/thread-426099-1-2.html. This post was last edited by deep007 on 2009-3-31 at 18:49.]
Reply #32009-04-01
1. On December 22, 2008, good news came from the Lu’an Tunliu Coal-based Circular Economy Park: China’s first demonstration project for producing coal-based synthetic oil, the Lu’an 160,000-ton project that utilized independent intellectual property rights, began to produce oil, with the first batch of coal-based synthetic oil being manufactured. This marked another significant achievement in Shanxi Province’s efforts to adjust its industrial structure and achieve transformational development. 2. On December 31, 2008, after 16 hours of operation, the Shenhua coal direct liquefaction demonstration project successfully achieved oil residue solidification at 7 a.m. on that day, completing the entire process and producing qualified oil products and chemical products. 3. On March 20, 2009, the industrial demonstration project for coal indirect liquefaction, a collaboration between Inner Mongolia Yitai Group Co., Ltd. and the core technology team from the Institute of Coal Chemistry of the Chinese Academy of Sciences via Zhongke Synthetic Oil Technology Company, began producing oil at 9:38 a.m. on that day in Jungeer Banner, Ordos City, Inner Mongolia. To date, the system has been operating stably. Based on the publicly released news, it seems to be the case that whether or not there is \"oil leakage\" follows the same standard
Reply #42009-04-05
It was all done by the people from the Coal Chemistry Institute, and they managed to accomplish it. As for whether that institution was truly the \"first\" in this field, well, ask them!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.