Constructibility analysis

2009-04-02View Original

Thread Content

Dear marine industry professionals, I have worked on an international engineering project where the client required a constructability analysis to be carried out during the design phase, before construction even began. Has anyone experienced this? What is the procedure for constructability analysis? What is the content and purpose? Thank you
Reply #22009-04-02
Some property owners in our country also make such requests, especially regarding things that they consider to be new. It mainly explains what machinery, roads, water and electricity facilities will be used, what plans will be adopted, as well as the layout of water, electricity, and gas, to show that construction is feasible. If you think about it carefully, you’ll see whether construction is possible. Similar to the construction organization design. But nowadays, some construction organization plans in China are written in such a general manner that they are becoming increasingly uninteresting. The above are my personal opinions. Looking forward to further answers from those with experience in overseas projects!
Reply #32009-04-02
It refers to the 2nd floor; for example, assessing the routes for large equipment to enter the site, determining the locations where large cranes should be installed, and planning the placement of temporary power transformers for construction purposes
Reply #42009-04-02
I believe it is very necessary to invite technical personnel from the design institute and several construction companies to discuss a feasibility analysis of the construction before starting work. For example, aspects such as the design of lifting lugs for lifting large equipment, the location of lifting points, and the positioning of lifting stations can be discussed.
Reply #52009-04-03
Are there any documents on this topic, specifying the content and methods of analysis, etc.?
Reply #62009-04-16
I think it mainly involves developing a plan for the construction of large-scale equipment, analyzing the feasibility of its design. If the design is not feasible for construction, then modifications to the design are necessary.
Reply #72009-04-17
Constructibility analysis is similar to the construction organization design used in China, but it places more emphasis on risk identification and mitigation. I believe its main purpose is to analyze and evaluate the characteristics of the project and the construction process, as well as the construction resources, and to provide recommendations.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.