HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Hold back blinds – Preparation work for on-site catalyst loading

2009-04-02View Original

Thread Content

Introduce and install catalyst hold back blinds for drop out pipes. What kind of blind plate is this hold back blind?
Reply #22009-04-02
It should be a “support blind plate”. Regarding catalyst loading, it is recommended to first consult relevant materials; such materials are available on this forum at http://bbs.hcbbs.com/viewthread.php?tid=160119
Reply #32009-04-05
The on-site engineer said it was a check blind flange
Reply #42009-04-05
Check valve blind plate – the poster didn’t provide any context. I think a check blind flange should be installed on the catalyst discharge pipe; it’s essentially a gate used to control the discharge rate. I’m not sure if I understand correctly; this is for reference only.
Reply #52009-04-06
It’s the check blind plate; nowadays translations are all messed up, which can easily confuse people

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.