HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to understand the responsibility for “drawing approval”

2009-04-03View Original

Thread Content

How to understand that the approval of drawings by an engineering company or design firm does not mean that the manufacturing plant is exempt from its responsibility for designing the construction drawings”
Reply #22009-04-03
Their confirmation is only regarding whether it meets the process requirements; they don’t care about material selection, strength calculations, or manufacturing inspections.
Reply #32009-04-03
My understanding is that the design unit responsible for the construction drawings must take full responsibility for the strength calculations and the overall structure as shown in those drawings, while other units are only responsible for verifying the drawings themselves, whether the design qualification stamps are valid, and whether the technical requirements meet the standards.
Reply #42009-04-03
What was said upstairs is correct; the customer can only verify whether the drawings meet the requirements of the manufacturing process, such as the position and size of pipe openings, as well as the required volume. Issues related to the design, manufacture, inspection, and performance of the equipment itself should be the responsibility of the design or manufacturing company
Reply #52009-04-03
I think the engineering company’s verification of the manufacturer’s drawings mainly involves further reviewing aspects such as the compliance of the design drawings, the compatibility of the materials and media used, and their conformity with the design specifications. The legal responsibility for the construction drawing design still lies entirely with the manufacturer.
Reply #62009-04-03
Equipment safety is the responsibility of the design and manufacturing units, while process performance (whether it is easy to use and whether it can meet production targets) is the responsibility of the verification unit.
Reply #72009-04-03
The goal is to eliminate the attitude of \"mind one’s own business\"”

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.