HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Principles of equipment layout diagrams

2009-04-03View Original

Thread Content

What should be taken into consideration when creating equipment layout diagrams?
Reply #22009-04-03
Your question is too general; you can look up the \"Regulations for the Design of Layout of Petrochemical Plant Equipment\" or relevant HG standards – you’ll find it by searching.
Reply #32009-04-03
Study the *Specifications for the Layout Design of Petrochemical Plant Equipment* carefully; it explains everything in detail. However, if there is indeed a project that requires equipment layout, it is still necessary to refer to the drawings of similar projects.
Reply #42009-04-03
I’ll introduce two documents to you: HG 20519-92 \"Uniform Requirements for the Content and Detail Level of Construction Drawings in Chemical Process Design\" and HG 20546-92 \"Design Specifications for the Layout of Equipment in Chemical Plants\". These documents contain clear requirements, and both should be available on the forum!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.