HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Which pipes in methanol plants require TIG welding for the root pass?

2009-04-03View Original

Thread Content

In methanol plant pipeline welding, which pipelines require TIG welding as a backing process? Is argon arc welding for backing required only for pipes that need flaw detection? Thank you all for your advice! ! !
Reply #22009-04-03
TIG welding for backing layer 1: is done to ensure that there is no weld slag inside the pipeline, thereby facilitating smooth operation of the automatic control valves. II: It is to enhance the welding strength of the pipeline.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.