HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How are the elbows for the process pipelines in the CO2 stripping urea high-pressure system manufactured?

2009-04-04View Original

Thread Content

Please discuss: For the process piping elbows in your CO2 stripping urea high-pressure system, are they purchased as finished elbows or fabricated by bending straight pipes? If it is bent, is it hot bending or cold bending? Which production method is better?
Reply #22009-04-04
They should all be finished elbow fittings; probably no factory dares to bend them on its own. With walls this thick, poor control can lead to serious problems.
Reply #32009-04-04
They are all finished elbow fittings, manufactured by professional manufacturers, with the user able to provide the manufacturing parameters. Ordinary nitrogen fertilizer companies estimate that they do not have the capability to produce it.
Reply #42009-04-04
It is difficult to meet the requirements for self-made elbows on pipes with large diameters and thick walls
Reply #52009-07-16
All high-pressure elbows are purchased as finished products, with Snam and Stamicarbon each having their own standards

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.