Talk about the abnormal situations you have encountered in transformation operations
Reply #22009-04-04
During the morning shift electric furnace heating production, the second section of the medium transformer overheated by 20°C. After taking over, I was confused. Is the production load about the same? The system pressure difference has not increased? Only the cold shock water flow rate between the second stage of the intermediate transformer increased. The temperature gauge of the second stage of the medium transformer was calibrated by the instrument engineer and turned out to be 50°C higher. After the cold shock water was reduced and the temperature was raised, the furnace resumed normal production due to the power outage.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.