HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Translation of Catalysts (I)

2009-04-06View Original

Thread Content

Loading Inert Support Balls: Before the absorbent material is added, inert support balls must be placed in the bottom of the vessel. A layer of 25mm ceramic balls is placed around and above the outlet collector, up to 200 mm below the bottom tan line. On top of this layer, there is another layer 100 mm thick, composed of 13mm ceramic balls. Finally, a layer 100 mm thick, made up of 6mm ceramic balls, is placed on top of the 13mm balls. Each layer should be level before the next layer is added. The position of the bottom tan line may not be easy to identify inside the vessel; it is necessary to refer to the vessel’s drawings to determine the distance from the weld line to the tan line if needed. Last edited by niulijun117 on 2009-4-7 15:40
Reply #22009-04-07
Is the poster asking us to translate? Don’t post repeatedly

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.