HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Hydraulic press control

2009-04-06View Original

Thread Content

This post was last edited by sunjl1981 on 2013-1-6 19:54 Our factory uses Asahi Kasei electrolyzer oil pressure control: Operating status of the electrolyzer Hydraulic oil pressure (MPa) Cl2 Pressure lock nut position Atmospheric pressure rise 1) Maintenance of the electrolyzer 1- Unlock 2) Pressure after membrane installation 7- Unlock 3) Membrane leakage test 7- Unlock 4) Electrolytic cell leakage test 9- Unlock 5) Filling 7- 20 mm away 6) Connection of main pipelines (H2, Cl2 gas valve open) 99 20 mm away 7) Circulation of electrolyte 99 distance 20 mm 8) Switch on DC 99 distance 20 mm 9) H2, Cl2 Pressure rise -9 distance 10 - 1 mm 10) Reach a stable temperature -9 distance 1 - 2 mm 11) After two hours of stable temperature -9 → Lock → 7 Locking nut 12) Stopping the electrolyzer without locking 9 → Lock → 79 → Lock → 7 13) Locked electrolyzer parking is locked (7) locked (7) locked 14) draining and washing membrane 7- locked #, , &

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.