HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Location of metering instruments for gas or steam pipelines

2009-04-07View Original

Thread Content

Location of metering instruments on gas or steam pipelines: Should the metering instruments for gas or steam pipelines be placed at the user’s end or at the supplier’s outlet end? I’m referring to the situation where there is only one user.
Reply #22009-04-07
It should be on the client side; I’m not sure, but everything I’ve seen is located on the client side
Reply #32009-04-07
Which side are you on? The supplier wants to place it at its export end, while the user wants to have it at their end; it mainly comes down to determining who is responsible for any losses in the pipeline
Reply #42009-04-07
Agree with the person above. It’s mainly a matter of interests; as long as both sides reach an agreement, that’s fine

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.