HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Do the EO and PO vent lines necessarily need to be sent to the water scrubber? How is the water discharged after washing?

2009-04-07View Original

Thread Content

Do the EO and PO vent lines necessarily need to be sent to the water scrubber? How is the water in the tower discharged after washing?
Reply #22009-04-08
What media do EO and PO represent respectively? Different design institutes often have different representation methods. The vent line leads to the washing tower – is it a washing tower? If the vent volume is large, could it be a vertical water seal tank with a larger diameter?
Reply #32009-04-17
Yes. The water in the tower after washing can be sent to wastewater treatment facilities

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.