HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Are the pipe supports for the pipes on the pipe tray placed right in the middle of the steel beam?

2009-04-08View Original

Thread Content

Are the pipe supports for the pipes on the pipe tray placed right in the middle of the steel beam? If it is installed in the exact center, then due to thermal displacement during operation, it will no longer be in the center.
Reply #22009-04-08
In the absence of stress or with low stress, it can be placed right in the middle of the steel beam. If stress is present, the length of the pipe support and its offset are determined based on the amount of displacement after calculation.
Reply #32009-04-08
Thermal pipelines need to be offset based on the value of their thermal displacement; typically, the offset amount is half of the thermal displacement value, and the direction of the offset is opposite to that of the thermal displacement.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.