Thread Content
Dear ones, is there any hero who can lend me a hand? The company wants me to take care of this; they say the oversight department needs this document, and it’s required for every product as well. I hope to get a sample to refer to.
This is definitely necessary. Otherwise, how can the quality control department in your company prepare the necessary documents? The main ones are the transfer cards for pressure-bearing components and the assembly process cards. Attachments cannot be sent in Word format; if that’s necessary, please provide an email address
Welding procedure specifications (welding cards): There are manufacturing process cards available as well on forums; just do a search – you’ll definitely find what you’re looking for
Refer to http://bbs.hcbbs.com/viewthread.php?tid=107470&highlight=%B9%A4%D2%D5%BF%A8 – it might be helpful
What I need is a special card for pressure vessel flow
1. Refer to the key control points in pressure vessel manufacturing. 2. Take into account the actual conditions of the company. 3. The process sheets should not be overly complicated; simplicity is sufficient, as otherwise they will hinder the workers’ ability to carry out their tasks. 4. Comply with the requirements of local inspection agencies, and be familiar with the design standards for pressure vessel manufacturing, such as GB150 and GB151
I have seen Lansi’s processing procedure sheets, which were created using CAD; the charts are well integrated. Unlike our company, which requires one diagram per card; even components under stress have to be included, it’s so annoying