HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The diaphragm electrolyzer was safely put back into operation after 2.5 months of shutdown

2009-04-10View Original

Thread Content

This post was last edited by sunjl1981 on 2013-1-6 at 20:04. I really didn’t expect the diaphragm cells in my company to resume operation right away, after having been shut down for two and a half months. . Note ← ) # ← , .
Reply #22009-04-11
Proper maintenance of the liquid level after stopping the electrolyzer tank is sufficient; generally, no problems arise over a period of three months. However, for safety reasons, it is better to remove the slots and check them to be sure.
Reply #32009-04-17
Which factory does this colleague work for? Could you leave your contact information? We can communicate on an individual basis. QQ: 931949440

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.