Thread Content
There have been quite a few test driving projects in the past few months; I hope everyone will come and share their experiences! Please discuss the work related to driving and testing Ha! Discussion formats: 1. By section: Utility systems, brine, ion membrane electrolysis, chlorine-hydrogen treatment, chlorine liquefaction and filling, hydrochloric acid, evaporation. 2. By specialty: Process engineering, electrical systems, instrumentation, safety and environmental protection, quality inspection and analysis, relevant operational documents (including regulations), sales of by-products generated during commissioning, logistics support, completion of installation and civil works, preparation of materials for commissioning, project acceptance, and so on! 3. By phase: Pre-commissioning, commissioning with feed material. The list of phases is not complete; please forgive any omissions! During the discussion, please introduce the process category of the device you are talking about or some general information related to it (for example: the manufacturer of the electrolyzer, the manufacturer of membrane-based nitrogen removal systems, etc.). This post was last edited by 181128425 on 2009-4-10 at 15:48.]
The current appearance of recovery is unique to our harmonious society: L
Our second-phase project is in full swing. Most of the equipment has arrived on site; the civil work is in its final stages, and the equipment is being installed. Due to the economic recovery, some equipment has not yet arrived temporarily because of rising raw material costs.
Our first phase of the project has undergone trial operation, and we are preparing to start phase two shortly
OP, which brand of ion exchange membrane cell did you choose?