HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What aspects are included in the process part of oil and gas separation treatment?

2009-04-12View Original

Thread Content

Do the calculations for valve sizes, container sizing, and piping system dimensions all fall under the process section?
Reply #22009-04-12
Yes, after the process parameters are calculated based on production requirements, those parameters are provided to the equipment, which then selects the appropriate model based on them.
Reply #32009-04-13
Yes, once the process parameters are determined, the equipment is used to select the appropriate types and materials

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.