Status of LNG production and reception facilities in China

2009-04-13View Original

Thread Content

List of LNG production and reception facilities in China; please add any missing information. List of LNG production and reception facilities in China: Design capacity of plants and reception stations (104 m3/d). Notes from operators: Plants that have been built – Zhongyuan Green Energy High-Tech: 15; Hainan Hainian Gas: 25; Hainan Hainian High-Tech Energy Co., Ltd.; Guangxi XinAo Weizhou: 15; Guangxi Beihai XinAo Gas; Tai’an Shenran: 15; Tai’an Shenran LNG Utilization Co., Ltd. Technology provided by the Institute of Physical Chemistry, Chinese Academy of Sciences – Ordos LNG project: 100; Ordos Xingxing Energy Co., Ltd.; Technology from ContiTech, USA – CNPC Southwest Branch: 5; Jiangyin Tianli Gas; CNOOC Zhuhai: 60. CNOOC has already completed the construction of Xinjiang Guanghui (Phase I): 150; Xinjiang Guanghui LNG Development Co., Ltd. Technology from Linde, Germany – Shanxi Ganghua Coalbed Methane LNG plant: 25. **China Gas and Shanxi Jinmei Group plan to start operations on December 16, 2008. Plants under construction – Sichuan Dazhou LNG plant: 100; Dongguan Telecom, Huixin Energy, Sichuan Guanghui, **Chengfu Lanza: 30; Lanzhou Gas Chemical Group. Chongqing: 15; Chongqing Minsheng Shares. Suzhou: 7; Suzhou Natural Gas Pipeline Company. Xinjiang Guanghui (Phase II): 400; Resources for Xinjiang Guanghui still to be determined. Under construction – Guangdong Dapeng reception station: 7.5 million tons per year. CNOOC, BP, etc. – Phase I already completed: 3.7 million tons per year; under construction. Reception stations – Shanghai reception station: 9 million tons per year; CNOOC, Shenneng. After 2010 – Fujian Putian reception station: 2.6 million tons per year; CNOOC Fujian Natural Gas Co., Ltd. Zhuhai reception station to be completed by the end of 2009: 9 million tons per year; CNOOC, Guangdong YueDian. After 2010 – Plans to build reception stations. Zhejiang Ningbo reception station: 6 million tons per year; CNOOC. After 2010 – Hainan reception station: 5 million tons per year; CNPC. After 2010 – Guangxi reception station: 3 million tons per year; CNPC. After 2010 – Jiangsu Rudong reception station: 3.5 million tons per year; CNPC. After 2010 – Hebei reception station: 10 million tons per year; CNPC. After 2010 – Liaoning reception station: 3 million tons per year; CNPC. After 2010 – Shandong reception station: 8 million tons per year; Sinopec. Last edited by yfq4308 on 2009-4-13 08:15
Reply #22009-05-30
May I ask until what date does the original poster’s statistical data cover? It is reported that the LNG project in Dapeng, Guangdong, was fully completed by September 2007

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.