On April 20, the groundbreaking ceremony for the main construction phase of Sichuan Petrochemical’s project with an annual production capacity of 1 million tons of ethylene and 10 million tons of refined oil will be held. The \"Petroleum and Chemical Industry Revitalization Plan\" approved by the State Council on February 29 calls for a total investment of around 400 billion yuan to build 20 major related projects. With careful preparation, the construction of China National Petroleum Corporation’s Sichuan petrochemical complex, which is capable of producing 1 million tons of ethylene and 10 million tons of refined oil per year, is set to begin. This post was last edited by laiqi on 2009-4-13 14:37]
The introduction of the Petrochemical Industry Revitalization Plan was timely and played a significant role in boosting consumption. With the commissioning of Sichuan Petrochemical’s project with an annual production capacity of 1 million tons of ethylene and 10 million tons of refined oil, many design and construction firms will have the opportunity to benefit from this project, and our institute also hopes to be able to take on some tasks related to it.
All the design work at Sichuan Petrochemical has not stopped; it’s just that the progress of the project is a bit slower. The detailed design work is now progressing in an orderly manner, with completion expected in 2012.
It’s finally time to get started!~:loveliness: There are some signs of improvement amid the crisis
It’s good news that economic growth is positive, but it’s a concern that Chengdu’s ecosystem may be affected
I heard about it back in 2006; it seemed to be in Pengzhou, Sichuan. It’s very close to home; our company might get a share of it again.
I hope that the Sichuan large-scale oil refining project will not ruin this beautiful and talented region of Bashu……
The project has been launched; it is hoped that it will contribute to the economic development of the disaster-stricken area; Everyone working in the petrochemical industry can get busy now; hehe, let’s all work hard to secure some projects······
All of CNPC’s teams have been deployed; it’s not clear whether there will be enough resources for other projects
Which organizations are participating?
I heard that the construction of the main structure is about to begin!~There are quite a few organizations involved in this project~At the very least, the design institutes from the CNPC group will be involved, and construction companies are certainly essential as well; since it’s located in the Land of Abundance, the Chengda Design Institute has an advantage due to its geographical location, and it handles projects of all sizes across the country without any problems. I guess that’s about it for the main structures; some auxiliary facilities, tank areas, and utility systems might be subject to public bidding!~
It is understood that Huisheng is involved in this project. I wonder if you are aware of the relevant details; could you please explain?
Progress accelerates on Sichuan Petrochemical’s integration project, China Petroleum News, April 23, 2009, 00:00. Report by our correspondent Zhao Jinbo: On April 20, the linear low-density polyethylene production facility of Sichuan Petrochemical Company began construction. Guided by the scientific development concept, Sichuan Petrochemical is accelerating the construction progress of its integrated refining and chemical project. This year, the Sichuan Petrochemical project will complete the preliminary design for the integrated refining and chemical processing facility, essentially finish the construction drawings, place orders for key equipment with long lead times, start the civil engineering work, and complete the construction of the underground main pipelines. Aiming to become a \"model integrated refining and chemical enterprise,\" Sichuan Petrochemical Company starts with its institutional mechanisms to develop a scientific management framework for project construction and production operations. By leveraging information technology and process constraints, and with a focus on a flat organizational structure, it creates an enterprise framework that is in line with international petrochemical companies, as well as an intelligent management system. The company fully adopts the \"IPMT (Integrated Project Management) + EPC project construction\" management approach, strictly controlling quality, safety, schedule, and costs to advance the process of integrated refining and chemical production.
Sichuan Petrochemical held the groundbreaking ceremony for its refining and chemical integration project. The new construction brings new hopes, and this new journey carries new dreams. On April 20, as part of the ongoing academic and practical activities, the Sichuan Petrochemical Integration Project was officially launched with the commencement of construction of the linear low-density polyethylene facility. Shen Diancheng, Vice President of the joint-stock company and Chairman of Sichuan Petrochemical Co., Ltd., along with leaders such as Li Chuncheng from the Sichuan Provincial Party Committee and the Chengdu Municipal Party Committee, participated in the foundation-laying ceremony for the project. Li Dongsheng, General Manager of Sichuan Petrochemical Company, spoke on behalf of all the constructors, stating that the construction of the Sichuan Petrochemical project is guided by the Scientific Outlook on Development, with the outcomes of learning and practice activities being applied throughout the entire project lifecycle. Keeping the mission in mind and living up to the trust placed in us, we will resolutely implement the decisions and arrangements made by the Party leadership group of the group company, the management of the joint-stock company, and the Party committees at all levels in Sichuan Province. We will adhere to the scientific development concept in guiding our entrepreneurial efforts, pursue a path of win-win cooperation, and advance project construction through thorough planning and effective measures. Our goal is to turn Sichuan Petrochemical into a model integrated refining and chemical enterprise with an optimized structure, advanced technology, high-quality equipment, an eco-friendly approach, an efficient organization, and standardized management – one that can withstand the challenges of global economic integration, domestic and international market competition, and increasingly stringent environmental regulations. Such an enterprise will serve as a benchmark for efficiency in the refining and chemical sector, a platform for innovation in scientific development, a support for the regional economy, a model for harmonious industry operations, and a contributor to enhancing the corporate value of China National Petroleum Corporation. The Sichuan Petrochemical Integration Project consists of 10 million tons of refining capacity per year and 800,000 tons of ethylene production per year. It includes 13 main refining units, 8 main chemical processing units, as well as auxiliary and utility systems, with completion and operation expected by 2012. This project began to take shape in 1988, going through a nearly 20-year process of twists and turns. During the 20-year period of preliminary evaluation, **the relevant ministries and authoritative agencies conducted thorough scientific assessments and rigorous step-by-step reviews regarding various aspects such as the regional planning, environmental impact, and technical standards of the project; as a result, all the requirements for approving the project were met**, and the project was included in the **Medium- and Long-Term Development Plan for the Refining Industry**. Following the Wenchuan earthquake, China National Petroleum Corporation actively organized post-earthquake assessments of the Sichuan petrochemical projects, properly evaluating factors such as the construction conditions and geological defenses in the areas where these projects were located. This provided a scientific basis for future construction efforts, ensuring the safety and reliability of the project construction and bringing benefits to the local population. On November 12, 2008, the **National Development and Reform Commission approved the commencement of construction for the Sichuan petrochemical project. In 2009, Sichuan Petrochemical will further refine its corporate structure and intelligent management framework, which relies on information technology, process controls, and a flat organizational design in order to integrate with international petrochemical companies. It will fully adopt the IPMT (Integrated Project Management for Engineering) + EPC project construction management model, strictly control quality, safety, schedule, and investment, complete the preliminary design for the integrated refining and chemical processing project, and essentially finish the detailed design work ; Complete the ordering of long-cycle critical equipment. Led by the linear low-density polyethylene plant that is now under construction, efforts will be made to advance the integration of refining and chemical production. In his speech, Shen Chencheng called on Sichuan Petrochemical to take on the mission entrusted to it by history, and to work together with all parties involved in the project to fully implement the scientific development concept. In line with the requirements of the new system and mechanisms, it is necessary to strengthen the organizational leadership for the project construction, organize tasks scientifically, make thorough plans, and carry out construction carefully, so as to ensure that the project is completed at a high level, to high standards, and at a rapid pace. Efforts should be made to turn the Sichuan refining and chemical integration project into a first-class, high-quality, green, and transparent project, thereby making greater contributions to the economic prosperity of Sichuan and to China National Petroleum Corporation’s efforts to become a comprehensive international energy company! (Zhao Jinbo) (Source: Sichuan Petrochemical Co., Ltd., 2009-4-22) This post was last edited by Hunter on 2009-4-24 at 11:15.]
Sure, I sincerely wish for the project to get underway; it’s good news for all involved parties. I hope our organization can also get involved.
The “1 million tons of ethylene project” of China National Petroleum Corporation’s Fushun Petrochemical Company also held its groundbreaking ceremony on April 21, 2009; CNPC moved quite quickly.
Which is more important, the economy or the environment?
Fushun Petrochemical’s million-ton ethylene project enters the actual construction phase 2009-04-23 14:02:17.0 China Petroleum News Center On April 21, reporters learned from the mobilization meeting for the construction of the million-ton ethylene project held by Fushun Petrochemical that China Petroleum has approved the project plan for expanding the company’s capacity to produce 800,000 tons of ethylene per year, and the overall plan for the project has been reviewed by experts. This marks the entry of the Fushun Petrochemical’s million-ton ethylene plant project into a full-scale and substantive construction phase, with the entire ethylene facility set to be completed by December 2011. The Fushun Petrochemical \"10 million tons of oil refining and 1 million tons of ethylene\" project, which is listed as one of the **20 key projects receiving priority support**, is a major project for China National Petroleum Corporation as well as the top priority project in Liaoning Province. It also represents a project that holds hope for driving the transformation of the local economy and improving people’s livelihoods. “As the core component of this project, the ‘million-ton ethylene’ facility requires an investment of 15.6 billion yuan. The main projects include a new ethylene plant with an annual production capacity of 800,000 tons (which, together with the existing production capacity of nearly 200,000 tons, makes up the million-ton ethylene capacity), a plant for producing 450,000 tons of linear low-density polyethylene, a plant for producing 300,000 tons of polypropylene, as well as eight other production units and utility systems and auxiliary facilities for production. This project was officially approved on April 26, 2004, and received approval from the **Development and Reform Commission on March 17, 2006. The groundbreaking ceremony was held on August 18 of the same year, and the land leveling and foundation preparation work for the new site was completed on June 30, 2008. At present, the preliminary design for all units of the project has been completed; 29 main items have passed the review by China National Petroleum Corporation, and contracts have been signed for the introduction of the \"three machines\" for the ethylene plant, two extrusion granulators for polyethylene, and three recycle gas compressors for polypropylene and polyethylene. The construction drawings for the foundations of the main towers and the underground pipeline network in the plant area have been delivered. 90% completion of introducing long-cycle procurement equipment. 58% of the total work related to off-site roads, underground pipelines, slope stabilization, trenches in the plant area, and foundation trench blasting has been completed, with an investment of nearly 3 billion yuan already made.