HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Question: Branch pipe reinforcement formula

2009-04-13View Original

Thread Content

31.3 Process Piping, Page 20: In the formula for calculating the reinforcement required for branch pipes, the reinforcement area needed for the branch pipe connection is given as A1=thd1(2-sinβ). What does (2-sinβ) represent in this context?
Reply #22009-04-13
β is the angle between the axis of the branch pipe and the axis of the main pipe, generally ranging from 45 degrees to 90 degrees. As for what the original poster meant by (2-sinβ), I’m not quite sure. . . This post was last edited by tekchina on 2009-4-13 17:22]
Reply #32009-04-13
I checked it – this blog post is written well. The author might want to take a look; it will definitely be helpful to you. http://llljq.bloghome.cn/posts/153706.html :)
Reply #42009-04-13
Okay, let me take a look. Thank you to the peers on floor 2 and floor 3 :)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.