This post was last edited by jimmmme on 2009-8-23 17:44. Hello, fellow sailors! Our company has recently taken on an EPC project, and the client has requested that we submit a equipment supervision plan. In previous projects, the equipment supervision was carried out by a supervision company appointed by the client; now, as the EPC general contractor, the client wants us to prepare such a plan for the equipment purchased as part of the EPC project. Those of you who have experience in this area – apart from pressure vessels, what other types of equipment require supervision? Are there any requirements regarding investment? This post was last edited by collins-2008 on 2009-4-18 at 11:52.]
We face the same problems as you; our equipment engineers spend their days in the workshops of the equipment manufacturers, where, in addition to providing guidance, their main task is to oversee the manufacturing quality. To ensure that equipment meets quality standards, relying solely on the conscientiousness of the manufacturers is not sufficient. To put it simply, if they want to maximize profits, the producers will inevitably cut corners. Regardless of the manufacturing of any device, supervision is always better than having no supervision.
Generally, in situations where the project timeline is tight, in order to speed things up and push manufacturers to meet their delivery schedules, people are sent on-site to oversee the manufacturing process, so as to keep up with the construction schedule. It may also be done for quality supervision and inspection, to ensure that the product quality meets standards and to carry out process quality control; this is also in line with the 9000 quality management system. If supervision of equipment manufacturing is required, it’s actually quite simple – the easiest approach is to hire a supervisor. haha. Of course, you can also prepare the supervision plan yourself. I remember there are standards for the supervision of electrical equipment; you can use such guidelines as a reference, and list all the aspects that need to be addressed based on the manufacturing processes of different types of equipment. Clearly define the standards and requirements for supervision. In short, the main priorities are speed and maintaining good relationships between all parties involved.
Dear sea friends, what I really want to know urgently is: which devices exactly require supervision during manufacturing?
Exactly what needs to be supervised during manufacturing depends on your industry. Apart from cases where supervision is mandatory – which is common in the power safety sector – it depends on the contract as well. You can ask the supervisor; it’s their responsibility. Equipment procurement supervision and equipment manufacturing supervision 8.1 Equipment procurement supervision 8.1.1 The supervision unit shall, in accordance with the supervision contract for the equipment procurement phase signed with the project owner, establish a project supervision team composed of the chief supervision engineer and professional supervision engineers. The supervision staff should be professionally qualified in number sufficient to meet the requirements of supervision work, and the division of labor and job responsibilities among them should be clearly defined. 8.1.2 The chief supervision engineer shall organize the supervision staff to become familiar with and master the various requirements, technical specifications, and relevant standards specified in the design documents for the equipment to be purchased. 8.1.3 The project supervision agency shall prepare a equipment procurement plan, specifying the principles, scope, content, procedures, approaches, and methods for equipment procurement, and submit it to the project owner for approval. 8.1.4 The project supervision agency shall prepare a equipment procurement plan based on the approved equipment procurement plan, and submit it to the project owner for approval. The main contents of the procurement plan should include a detailed list of the equipment to be purchased, the schedule for the procurement process, an estimate sheet, and a plan for the allocation of funds for procurement. 8.1.5 The project supervision agency shall organize or participate in market research based on the equipment procurement plan approved by the project owner, and shall assist the project owner in selecting the equipment suppliers. 8.1.6 When equipment procurement is carried out through bidding, the project supervision agency shall assist the project owner in organizing the equipment procurement bidding in accordance with relevant regulations. 8.1.7 When equipment procurement is carried out through a method other than bidding, the project supervision agency shall assist the project owner in the technical and commercial negotiations regarding the equipment procurement. 8.1.8 The project supervision agency shall participate in the negotiation of the equipment procurement contract after the equipment supplier is determined, and assist the project owner in drafting and signing the equipment procurement contract. 8.1.9 After the supervision work for equipment procurement is completed, the chief supervision engineer shall organize the preparation of a summary of the supervision work. 8.2 Equipment Supervision 8.2.1 The supervision unit shall, in accordance with the supervision contract for the equipment supervision phase signed with the project owner, establish a project supervision team composed of the chief supervision engineer and professional supervision engineers. The project supervision agency should be stationed at the equipment manufacturing site. 8.2.2 The chief supervision engineer shall organize the professional supervision engineers to familiarize themselves with the equipment manufacturing drawings, relevant technical specifications and standards, so as to understand the design intent, the manufacturing procedures for each type of equipment, as well as the various provisions in the equipment procurement contracts. He shall also organize or participate in the design briefings for the equipment manufacturing drawings held by the project owner. 8.2.3 The chief supervision engineer shall organize the professional supervision engineers to prepare a equipment manufacturing supervision plan, which shall be submitted to the project owner within ten days prior to the start of equipment manufacturing, after being reviewed and approved by the technical director of the supervision unit. 8.2.4 The chief supervision engineer shall review the equipment manufacturing production plan and process plan submitted by the equipment manufacturer, and provide review comments. Approval will be granted upon meeting the requirements, and the matter will be reported to the project owner. 8.2.5 The chief supervision engineer shall review the qualifications, actual production capacity, and quality assurance system of the equipment manufacturing subcontractor, and approve them once they meet the requirements. 8.2.6 The professional supervision engineer shall review the inspection plan and requirements for equipment manufacturing, and confirm the inspection timing, content, methods, standards, as well as the testing procedures, equipment, and instruments for each stage. 8.2.7 The professional supervision engineer must review the certification documents and test reports for the new technologies, new materials, and new processes to be used in the equipment manufacturing process, and provide their opinions thereon. 8.2.8 The professional supervision engineer shall examine the production process equipment, operating procedures for major and critical components, as well as the qualifications of the relevant production personnel, and inspect the environment at the equipment manufacturing and assembly sites. 8.2.9 The professional supervision engineer shall review the quality certification documents and inspection reports for the raw materials used in equipment manufacturing, as well as for purchased components, parts, standard components, and blanks. The engineer shall also check the quality inspection carried out by the equipment manufacturer on the purchased components, parts manufactured through external cooperation, and materials. Finally, the professional supervision engineer shall examine the submission documents provided by the equipment manufacturer and approve them if they meet the specified requirements. 8.2.10 The professional supervision engineer shall supervise and inspect the equipment manufacturing process, and conduct random sampling or inspections on the manufacturing procedures of major and critical components. 8.2.11 The professional supervision engineer shall require the equipment manufacturer to carry out inspections during the equipment manufacturing process in accordance with the approved inspection plan and requirements, keep proper inspection records, and review the inspection results. When the professional supervision engineer determines that it does not meet quality requirements, he/she instructs the equipment manufacturer to make corrections, repairs, or rework. In the event of quality loss of control or major quality incidents, the chief supervision engineer must issue an order to suspend manufacturing, propose solutions, and report to the project owner in a timely manner. 8.2.12 The professional supervision engineer shall inspect and supervise the equipment assembly process, and grant approval once it meets the requirements. 8.2.13 During the equipment manufacturing process, if changes are required to the original design of the equipment, the professional supervision engineer shall review such design changes, as well as any increases or decreases in costs and changes in the manufacturing timeline resulting from those changes. 8.2.14 The chief supervision engineer shall organize the professional supervision engineers to participate in the commissioning, overall performance testing, and verification during the equipment manufacturing process, and grant approval once the requirements are met. 8.2.15 Before the equipment is delivered to the site, the professional supervision engineer shall inspect the protective and packaging measures taken by the equipment manufacturer for the equipment to be transported, and check whether they meet the requirements for transportation, loading/unloading, storage, and installation. Additionally, it shall be verified that all relevant accompanying documents, packing lists, and attachments are complete. 8.2.16 After all the equipment has been delivered to the site, the chief supervision engineer shall organize the professional supervision engineers to participate in the handover process carried out by the equipment manufacturer in accordance with the contract provisions, including unpacking, inspection, acceptance, and transfer. 8.2.17 The professional supervision engineer shall review the progress payment requests submitted by the equipment manufacturer in accordance with the provisions of the equipment manufacturing contract, provide review comments, and the chief supervision engineer shall issue the payment certificate. 8.2.18 The professional supervision engineer shall review the claim documents submitted by the project owner or the equipment manufacturer, submit opinions thereon to the chief supervision engineer, who will then conduct consultations with the project owner and the equipment manufacturer to prepare an audit report. 8.2.19 The professional supervision engineer shall review the equipment manufacturing settlement documents submitted by the equipment manufacturer, provide review comments, and submit them to the chief supervision engineer for examination. The chief supervision engineer shall then conduct consultations with the project owner and the equipment manufacturer, and prepare a supervision review report. 8.2.20 After the equipment supervision work is completed, the chief supervision engineer shall organize the preparation of a summary report on the equipment supervision work.
First, evaluate the equipment; equipment that has a significant impact on production must be under supervision during manufacturing. For those with a major impact, irregular inspections are necessary. As for less important equipment, it can be inspected upon delivery
1. In accordance with relevant regulations such as the Interim Measures for Equipment Supervision Management, the processes of design, procurement, manufacturing, installation, and commissioning of complete sets of equipment and key unit equipment required for large and medium-sized capital construction projects, technical transformation projects above a certain scale, etc., in order to support industrial production processes and establish production capacity, as well as the important hardware for key information systems and the software necessary to support their operation, must all be included within the scope of equipment project management. 2. Based on our experience, for the main equipment, critical equipment, and large-scale units in production facilities, supervision agencies are engaged to dispatch supervision engineers to conduct on-site supervision of manufacturing at the factory. 3. For pressure vessels, we do not conduct on-site supervision for all of them; generally, supervision is only carried out for high-pressure vessels and category III vessels ; Other containers only undergo on-site inspections at the manufacturing plant irregularly, as well as pre-shipment preliminary inspections. 4. Regarding the determination of the equipment for on-site supervision during manufacturing, there is no absolute limit on our investment amount; it is merely relative ; Rather, it focuses more on the importance of the equipment during the operation of the production facility. For reference!
I am currently supervising the production at Shenyang Blower Factory. Generally speaking, there are two issues: first, the progress does not meet the requirements of your on-site construction; II. Concerns that the quality may not be up to standard, as manufacturers might cut corners in production (I personally think state-owned enterprises wouldn’t have such problems; it’s not in their interest to do so, but if issues arise, they will have to take responsibility). It’s difficult to get goods delivered when dealing with large state-owned enterprises like SHENGU – I’ve had enough of being treated like a servant :) :) :)
For owners, projects with tight deadlines, high quality requirements, and those involving concealed work during the manufacturing process that requires supervision should all implement supervised manufacturing.
8# c7904 I would like to ask you for some knowledge regarding the supervision of equipment manufacturing in the field of pressure reaction vessels; QQ: 39953939
We will also go to supervise the equipment shortly; please provide some information