Two-stage furnace of Xi’an Thermal Power Institute

2009-04-14View Original

Thread Content

The two-stage furnace developed by Xi’an Thermal Power Institute completed its pilot test in April 2006, and the results from those tests were quite good. If industrial-scale production is successful, it should be competitive with Shell’s version. According to their work plan, industrial scale-up was to be completed in 2009, with plans to apply it to the IGCC system at Huaneng Group’s Tianjin Green Coal Power Company (with a coal feed rate of 1000 T/d). However, the IGCC project at Huaneng Group’s Tianjin Green Coal Power Company is still awaiting approval from **the relevant commission; therefore, it is not known what the current progress of that project is Were there any bottlenecks encountered during the industrial scaling-up process? Kind-hearted people who know about this could please share it with everyone
Reply #22009-04-14
To be honest, the development of two-stage reactors is rather average; there are no industrial-scale installations available at present. The 300,000-ton methanol project in Inner Mongolia’s Shilin area has not yet had its design completed, and the level of detail in the process design is insufficient. (Insider)
Reply #32009-04-15
The Tianjin Huaneng project might be pushed back to 2010
Reply #42009-04-15
The IGCC project of Huaneng Tianjin Green Coal Power Company has now completed the works related to infrastructure construction and site preparation, and is awaiting approval
Reply #52009-04-15
The emergence, development, and maturation of an engineering technology follow a certain process, just like the growth of a person. The two-stage furnace developed by Xi’an Thermal Power Institute has only completed pilot testing; it is normal for there to be some aspects that need improvement in the industrialization process. As a Chinese, I hope it will grow strong and first replace foreign gasification technologies in China. As LZ said, “It should be on par with Shell’s.” ”
Reply #62009-04-15
I hope more people who are in the know will participate in the discussion, so that everyone can have a comprehensive understanding of the situation
Reply #72009-04-15
I have been to the sites of Tianjin and Shilin. In Tianjin, everything is pending a decision from the Development and Reform Commission; some contracts for large-scale equipment have already been signed, but they have not yet been implemented. It’s probably still early at Shilin; their factory even doesn’t have a place where people can eat.
Reply #82009-04-15
Where are the gasifiers for Huaneng’s green coal-fired power plants manufactured? Do those in the know understand?
Reply #92009-04-16
The pilot plant furnace was manufactured by West Nuclear; as for IGCC, it’s not clear, but West Nuclear is the most likely candidate
Reply #102009-04-17
Dude, there seems to be an issue with the capacity – it’s supposed to be 2,000 tons per day, not 1,000 tons. Tianjin Green Coal Power is working on this, so there are likely to be some problems. As for the extent of those problems, it’s hard to say; it’s just a concept. SHELL has been conducting tests in the Netherlands for a long time; they also have alternative fuels. It seems they don’t have much natural gas or anything like that, so there will likely be many problems in the future. These are just my personal insights for everyone’s reference. :) :handshake
Reply #112009-04-21
A friend works at the Xi’an branch, so they know a bit about it. Right after completing the pilot test at Xi’an Institute, it took on two projects in Tianjin and Shilin, which helped with the promotion of its two-stage furnace. However, later on, other factors affected the progress, thereby impacting the development of this two-stage furnace. The lack of funding for the Shilin project has delayed its progress. It is said that funds became available last year, and the project is progressing rapidly at present. For the Tianjin project, the preliminary design and the procurement of key equipment have been completed; it is now awaiting project approval. As for inferring the project progress based on difficulties in eating upstairs, I think it’s inaccurate. I haven’t been to the sites of these two projects; I’ve only been to some other projects in Inner Mongolia. At some of those sites, there are just a couple of sheds at the entrance where there are restaurants serving Sichuan and Hunan cuisine, and the conditions there are not even as good as those of street stalls in the city. I don’t know anything about the rest; let someone from the Thermal Engineering Department answer
Reply #122009-04-22
Could everyone please explain in detail how far Seelin’s project has progressed?
Reply #132009-04-22
For the Shilin project, the 1,000-ton vaporization furnace equipment has already been ordered! The manufacturer is Hangzhou Boiler!
Reply #142009-04-23
Green coal-fired power: Coal processing capacity of the gasifier: 2000 t/d (full waste boiler process). Thermal Engineering Institute + Sinopec Ningbo Engineering Company + Shanghai Boiler Factory. Shilin 300,000-ton methanol plant: Coal processing capacity of the gasifier: 1000 t/d (quenching process). Thermal Engineering Institute + Wuhuan Technology Company + Hangzhou Boiler Factory
Reply #152009-04-23
If the quenching process for Shilin’s 300,000-ton methanol gasifier is optimized successfully, it would be truly inspiring!
Reply #162009-04-24
Recently, another technical agreement was signed with those American bastards; we’re going to sell it to them, hehe
Reply #172009-05-06
How is the IGCC project at Huaneng Tianjin Green Coal Power Company progressing currently?
Reply #182009-05-07
20# Remnant Wolf Wisdom: Project commencement in May
Reply #192009-05-07
What does “five connections and one leveling” mean??????

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.