How to understand primary meters and secondary meters? I often hear it, but I don’t know its exact meaning
Reply #22009-04-14
Meters that perform on-site measurement and indication are primary meters, while those that display and record the data after transformation are secondary meters
Reply #32009-04-14
In simple terms, instruments installed at the site are called primary instruments, while those in the control room are called secondary instruments.
Reply #42009-04-14
The information on the first floor is correct; secondary meters don’t necessarily all need to be installed indoors.
Reply #52009-04-14
Does the transmitter belong to the primary or secondary side?
Reply #62009-04-14
Transmitters are generally classified as secondary instruments.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.