HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Monitor in HTRI output report

2009-04-14View Original

Thread Content

The tubeside monitor in the HTRI output report shows the temperature variation of \"Length from tube inlet\" across different length segments. I would like to ask for information regarding segmented calculations, or what kind of resources should be consulted?
Reply #22009-04-15
So far, it seems there is no detailed information available regarding the segmented calculation of HTRI; this must be something they keep confidential. . .
Reply #32009-04-17
I would like to ask the original poster whether it is possible to change the number of length segmentation points; for more details, see http://bbs.hcbbs.com/thread-423419-1-1.html

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.