Current status of dry quenching in my country (including those already in production and under construction) 2007, 8 Coke output of design companies, capacity of 10,000 t/a, number of t/h sets After localization in 2001 ACRE 6059759057 China-UFJ 1675218515 China Steel 2202752JEF 1101401 Total 80641019075 Before localization 755124517 Total 88191143592 CDQ units put into production in my country in 2007, 8 design company Coke output, capacity of 10,000 t/a, number of t/h sets After localization in 2001 ACRE 2210275522 China UFJ 4856205JEF 1101401 Total 2805351528 Before localization 755124517 Total 3560476045 Coke dry quenching status in my country after localization in 2001 (1) 2007, 8 Factory name Number of sets and capacity t/h Coke output 10,000 tons/year Commissioning time Design company notes Maanshan Iron and Steel No. 5 and 6 furnaces 1×125 100 2004.3 ACRE general contract for domestically produced Tongshan Iron and Steel Coking 1×100 80 2004.6 ACRE complete set of equipment for domestically produced Xiangtan Iron and Steel Coking 1×75 60 2005.5 ACRE designed domestically produced Kunming Iron and Steel Coking 1×140 110 2005.6 ACRE designed domestically produced Esteel Coking 1×140 110 2005.7 ACRE is the general contractor for localized Angang Chemical Plant 2×140 220 2005.7 2005.12 ACRE is the general contractor for localized Benxi Iron and Steel Coking 2×150 240 2005.7 Under construction ACRE is designing localized Shanghai Coking 1×75 60 2006.6 ACRE is general contracted for localized Nanjing Iron & Steel Coking 1×75 1×140 60 110 2006 2006.3 ACRE is the general contractor for domestically produced Pangang Coal Coking 1×145 120 2006.1 ACRE is general contractor for domestically produced Lianyang Coal Coking 1×140 110 2006.6 ACRE is general contractor for domestically produced Maanshan Iron and Steel No. 1~4 furnaces 2×125 200 2007.5 Under construction ACRE is general contractor for domestically produced Tangshan Iron and Steel Coking 1×150 130 2006.6 ACRE general contract for domestically produced Tangshan Iron and Steel Coking 1×180 144 2008. ACRE general contract for domestically produced Laigang Coking 1×140 110 2005.12 ACRE designed the second phase of domestically produced Laigang Coking 1×150 120 Under construction ACRE designed domestically produced Jiugang Coking 1×140 110 Under construction ACRE designs domestically produced Hangzhou Iron and Steel coking 1×75 60 2006.5 ACRE designs domestically produced Tonggang coking 1×125 110 Under construction ACRE designs domestically produced Shagang coking 1×140 110 2006.12 ACRE designs domestically produced Beitai coking 2×125 200 Under construction UFJ Angang Chemical Phase III 1×140 1×125 210 ACRE under construction design Angang Bayuquan 2×160 255 ACRE under construction general contractor Maanshan Iron and Steel New District 2×130 220 2007.1~4 ACRE general contractor Shagang Coking 2×140 220 2005.5~6 JFE ACRE cooperative design Wuhan Iron and Steel Coking 1×140 110 2003.12 Nippon Steel ACRE Co-designed Shougang Coking 1×65 45 Completed in 2003 China-Japan Shougang Jingtang Iron and Steel Co. 2×140 210 Under construction China-Japan Shougang Qian’an Coking 2×140 220 Under construction China-Japan Jinan Steel Coking 1×150 120 2006.12 China-Japan General Contracting Steel Coking 2×125 200 Under construction China-Japan Steel Coking 1×125 100 2006 Sino-Ultimate Steel Co., Ltd. Coking 1×140 110 2005.11 Sino-Japanese Federation General Contracting Xinyu Coking 1×125 100 Under construction Sino-Japanese Federation Ningbo Coking 1×140 110 General contracting Sino-Japanese Federation WISCO Coking 2×140 1×125 320 Design ACRE Handan Coking 2×140 220 General contractor ACRE Shagang Coking 2×140 220 Design ACRE Taigang Coking 2×150 240 Under construction ACRE JFE Liuzhou Iron and Steel Coking 1×150 120 Under construction China Steel Liuzhou Iron & Steel Coking 1×150 120 Under construction ACRE Xinjiang Bayi 1×125 100 Under construction China Steel Antai Coking 1×150 120 Design ACRE Meishan Coking 1×140 110 ACRE under construction Bengang Coking 1×190 150 ACRE under construction Daye Coking 1×125 100 ACRE under construction Xinjiang Bayi 1×125 100 ACRE under construction Anyang Coking 1×75 1×140 170 General contractor ACRE Shaoguan Coking 1×75 1×140 170 General contractor ACRE Lingyuan Coking 1×140 110 General contractor ACRE Liangang Coking 1×125 100 Under construction ACRE Tiantie Coking 1×190 150 Under construction ACRE Yankuang Coking 1×125 100 Under construction ACRE Laigang Phase III 1×140 110 Under construction ACRE Shandong Tiexiong 1×125 100 Under construction ACRE Weifang Steel Plant 1×100 80 Under construction ACRE Baosteel Phase I 4×75 175 1985.9 Nippon Steel introduced the complete set of Baosteel Phase II 4×75 175 1996.6 Nippon Steel ACRE cooperated to design Baosteel Phase III 4×75 175 1997 ACRE introduced three major components Shanghai Pudong Gas 2×70 60 1996 Ukraine fully introduced Jinan Iron and Steel No. 1 and No. 2 furnaces 2×70 120 1999 Ukraine partially introduced Shougang Coking 1×65 50 2001 Nippon Steel introduced total: 17 sets of 7.55 million tons/year dry quenching projects undertaken by Beijing Sino-Ultimate Steel Co., Ltd. in recent years Main construction unit Project and location Scale Opening and completion date Construction method Contract fulfillment Shougang Construction Shougang Phase I 65t/h 1999,6~2001,3 Good design Shougang Construction Shougang Phase II 65t/h 2003,8~2004,12 Good design Chengde Iron and Steel Company 80t/h 2003,10~2004,6 Design completed for No. 2 coke oven of No.1 Wuhan Iron and Steel Co., Ltd. 140t/h 2004.6~2005.11 Excellent general contracting for Shougang Construction General Qian'an Zhonghua Coal Chemical Company 2×140t/h 2005.4~2006.11 Good general contracting for No.6 and No.7 coke ovens of No.15 Metallurgical Group Co., Ltd. 150t/h 2005,5~2006,10 Good general contracting for No. 5 and No. 6 coke ovens of Baotou Steel Group Co., Ltd. 150 t/h 2005,1~2006,9 Good design for No. 7 and No. 8 coke ovens of Jinan Iron and Steel Co., Ltd. 2006.5~2007.10 General contracting for Shandong Hongda Company under construction 115t/h 2007.8~2009.1 General contracting for Ningbo Iron and Steel Company under construction 140t/h 2007.4~2009.8 General contracting for Shandong Yutai Coking Plant under construction 2×140 t/h 2006.11~2008.3 Design feasibility study stage Henan Juxin Thermal Power Company 4×140 t/h 2006,11~2008,2 Design feasibility study stage Tangshan Zhongrun Coal Chemical Company renovation 140 t/h 2006,10~2006,12 Design feasibility study stage Jingdezhen Menmenzi Ceramics Chemical Co., Ltd. renovation 125 t/h 2007,1~2007,2 Design preliminary design Xinyu Iron and Steel Company 155t/h + 2×90t/h 2007,6~2009,2< General contracting design Shougang Jingtang Iron and Steel Company 260t/h 2007,5~2008,12 Benxi Beiying Iron and Steel Company 2×125 t/h general contracting design 2007.9~2008,12 Comments on general contracting design: 1. With relevant policy intervention, a substantial decrease in investment in CDQ after localization, and an improvement in domestic design levels, CDQ has been widely promoted. ; 2. Both established and under-construction plants have seen the benefits of energy saving and emission reduction of coke dry quenching and the effect of improving coke quality. ; 3. Under the current good situation of the coking plant, with sufficient funds, we will step up construction as long as the policy stipulates that it is built and is conducive to environmental protection and our own interests. This post was last edited by ryn on 2009-4-15 14:31 ]