HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Which equipment determines the bottlenecks in the low-load operation of delayed coking?

2009-04-15View Original

Thread Content

Which equipment determines the bottlenecks in the low-load operation of delayed coking?
Reply #22009-04-15
The bottleneck under low-load operation depends on the minimum flow rate of the heating furnace’s radiant tubes and the minimum gas phase velocity specified in the design of the distillation tower.
Reply #32009-04-15
Operating conditions of the heating furnace, tube issues, size of the coke tower
Reply #42009-04-15
“The “low-load” operation bottleneck has nothing to do with the size of the coke tower, right? “The “high load” operation bottleneck is also related to the size of the coke tower.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.