Please give guidance: How to conduct completion acceptance of coking plant? Who is participating? How should I get started? (Note: Please explain the two situations: the factory has been built and the factory has not been built.) If the factory has been built but has not been inspected, how will it be inspected and accepted? Note: To generate an acceptance report. This post was last edited by laiqi on 2009-4-16 15:34 ]
1. Unit engineering (or major: Project) Completion acceptance is targeted at unit projects or certain professional project content. If a construction project construction contract is signed independently, after the completion conditions are met, the contractor can hand over the work alone. The contractor will organize the completion acceptance based on the basis and standards for completion acceptance and the project content agreed in the construction contract, which is more flexible and adapts to the current universality of project contracting. According to the current classification standards for construction projects, unit projects are components of a single project and have independent construction drawings. After the contractor completes the construction, with the consent of the contractor, or if the original construction contract has been agreed upon, phased acceptance can be carried out. This acceptance method is relatively common in some larger, group-based, and technically complex construction projects. After my country joins the WTO, more and more foreign investment or cooperation will be used in the field of construction projects, and international practices will be increasingly adopted. The practice of segmented acceptance or intermediate acceptance is also in line with international practice. It can effectively control the quality of sub-items, divisions and unit projects and ensure the realization of the system goals of construction projects. In recent years, our country has also learned from some international experiences and practices, revised the model text of construction contracts, and added clauses for intermediate delivery. The new "Construction Project Construction Contract (Model Text)" GF-1999-020l "General Clauses" 32.6: “The scope and completion time of the intermediate delivery project shall be agreed upon by both parties in the special clauses, and the acceptance procedure shall be handled in accordance with paragraph 32.4 of these general clauses." In the "Special Clauses" of the construction contract, once the two parties agree on the scope and completion time of the intermediate delivery project, such as which unit project(s) will be delivered first in a group project, or which contract section of a highway project will be delivered first, etc., then the phased completion acceptance should be carried out in accordance with the procedures agreed in the contract. 2. The completion acceptance of a single project means that in an overall construction project, a single project or a workshop has been completed according to the project content specified in the design drawings and can meet the production requirements or meet the conditions for use. The contractor submits a "project completion report" to the supervisor. After the "Project Completion Inspection Form" is signed and approved, a "Delivery Completion Acceptance Notice" should be issued to the contractor, explaining the project completion status, preparations for completion acceptance, equipment no-load stand-alone test run status, and specifically agreeing on matters related to delivery completion acceptance. For individual construction projects that are contracted through bidding competition, according to the provisions of the construction contract, the contractor will still issue a delivery notice to the contractor to organize acceptance. Before completion acceptance, the contractor must follow * * It stipulates that all completion materials should be sorted out and preparations for on-site completion acceptance should be completed, and delivery requirements should be clearly stated. The contractor should organize formal acceptance in a timely manner according to the agreed procedures. For the completion acceptance of industrial equipment installation projects, the trial operation of the equipment must be carried out step by step according to the equipment technical specifications and stand-alone test run plan. After passing the acceptance inspection, the completion acceptance report of the equipment installation project should be signed. 3. The completion acceptance of all projects means that the entire construction project has been completed according to the design requirements and has met the completion acceptance standards. The contractor should organize the design, construction, supervision and other units and the archives department to conduct the completion acceptance of all projects. The completion acceptance of all projects is generally carried out on the basis of the completion acceptance of unit projects and individual projects. For unit projects (intermediate delivery) or individual projects that have been delivered for completion acceptance and have gone through the handover procedures, in principle, the acceptance procedures will not be repeated, but the completion acceptance report of the unit project or individual project should be explained as an attachment to the completion acceptance of the entire project. For the completion acceptance of all projects in a construction project, a large amount of basic work for completion acceptance has been carried out in the completion acceptance of unit projects and individual projects. In fact, most of the organization work for the completion acceptance of all projects is the responsibility of the contractor, and the contractor mainly creates the necessary conditions for the completion acceptance. The main tasks for the completion acceptance of all projects are: Responsible for reviewing the acceptance status of all aspects of the construction project ; Listen to work reports from relevant units (design, construction, supervision, etc.) ; Review of project completion files ; Conduct on-site inspections of projects and make comprehensive evaluations of design, construction, supervision and other aspects of work as well as project quality and commissioning conditions. As the main contracting (construction) body of the construction project, the contractor should participate in the completion acceptance of the relevant projects throughout the entire process.
Acceptance must be carried out at any time during construction, not after it is completed. If you wait for acceptance after completion, if there is a problem in any area and the construction is not carried out according to standards, it will waste a lot of manpower, material resources and construction period. The acceptance inspection is mainly divided into internal industry and external industry. The internal industry mainly checks whether the construction unit and manufacturer have certain standards and certificates. Everything has a standard and works according to the standard. Field workers mainly inspect each area such as civil construction, masonry, and equipment installation, and must work according to drawings and design requirements. The above are personal opinions and are for reference only!
Thank you, second floor! Now in private enterprise construction projects, since there is no supervision, can the individual acceptance signed by the person in charge of the factory be accepted? * * Recognition? Does the completion report have to be stamped by the design unit? Which departments should be reported to for final completion acceptance? Like the Safety Inspection Bureau for safety assessment, the Environmental Protection Bureau for environmental assessment, etc.