HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The issue of steel stamp for welder codes

2009-04-16View Original

Thread Content

It seems that it is no longer required to stamp welder identification marks on equipment and pipelines, but I can’t recall what the basis for this is. If any friend could let me know, I would be very grateful.
Reply #22009-04-16
It’s still needed; I haven’t heard that it’s been canceled.
Reply #32009-04-16
I’m not trained in welding; I believe you’ve already looked up the relevant standards. However, sometimes there are updates to those standards, so you might want to check them out – hoping it will be useful to you.
Reply #42009-04-16
For your reference: http://www.jxcad.com.cn/read-htm-tid-689064.html
Reply #52009-04-17
Based on past construction experience, it is not necessarily required to stamp the pipe welding seams; instead, a marker pen can be used to indicate the welder’s code, seam number, welding date, pipeline number, etc., next to the seam, and these details can be recorded and entered into the computer on a daily basis.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.