HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How is the size of the elliptical hole at the bottom of the sliding-end support of the heat exchanger determined when specifying requirements for pipeline design?

2009-04-16View Original

Thread Content

When specifying requirements to the equipment discipline in pipeline design, how is the size of the elliptical hole at the bottom of the sliding end support of the heat exchanger determined?
Reply #22009-04-16
This was determined by the equipment team itself; the bearing standards for that team include these values. Once the equipment specifications are finalized, they are sent back to the process engineering team.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.