HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the development of welding procedures

2009-04-17View Original

Thread Content

When preparing a welding procedure, can the longitudinal welds of plate coils and tubes, which are of type AR, and the welds between pipes or between pipes and flanges, which are of type BG, be listed on the same procedure card? Can the welder’s position be replaced with one? For example, should the welder’s position always be written as SMAW-II-2G(K)-12-F3J?
Reply #22009-04-17
If the same weld assessment can be used, it can be on the same card.
Reply #32009-04-17
One more question: can the welder positions for welded pipes and welded plates be used interchangeably?
Reply #42009-04-19
For welding procedure qualification, refer to DLT 868; the procedures can be downloaded online or purchased from bookstores

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.