How to control the safe intersection between construction and commissioning
If it is true that the building and construction work is intertwined as the poster said, first of all, the poster's unit has violated the regulations, because after the project is completed, it is not allowed to be put into use before acceptance. If the poster's project is not completed, there is definitely no acceptance, so how can it be tested? In addition, for cross-operation operations, operators on both sides need to be informed of the dangers involved in construction and commissioning. There must be unified command and dispatch on site, and remember not to give random orders.
What you said on the second floor is so right. For everyone’s safety, we must follow the regulations and standards!
After the construction of the project is completed, it needs to be inspected and accepted. If the acceptance is passed, the final handover will be carried out and transferred to Party A. Then the construction personnel will withdraw from the construction site and Party A's start-up personnel will enter the construction site to carry out process connection, purging, test run, etc. Test run is not allowed before the completion of construction.
What if it was remodeled or expanded?
My device is in production, but what if a new device needs to be installed next to it (the wall next to the device being produced)?