HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the piping for liquid sulfur pipelines!

2009-04-17View Original

Thread Content

Has anyone ever worked on the piping for liquid sulfur pipelines? Is a jacket needed? What are the things to keep in mind? Thank you!
Reply #22009-04-17
For jacketed pipes or electric heat tracing, high standards are required for pipeline welding, with 100% non-destructive testing necessary
Reply #32009-04-18
Eddy currents, flaw detection, ultrasound! !
Reply #42009-04-20
Piping must have a slope and must not form bulges.
Reply #52009-04-20
The sulfuric acid pipelines built in the past did not have heat tracing, and ordinary carbon steel pipes were sufficient. Be careful to avoid sharp bends and dead ends; the quality of the welds must be satisfactory. Another important point is to try to avoid using water for pressure testing, as it is difficult to dry out after such testing, which makes things more complicated.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.